午夜看片在线免费观看-午夜看一级特黄a-午夜理理伦a级毛片-午夜理理伦a级毛片天天看-午夜理伦三级在线观看-午夜理论

Welcome to the official website of Shanghai Industrial Boiler Co., Ltd. / Shanghai Industrial Boiler (Wuxi) Co., Ltd.

Home
TEL:0510-88787772
Application areaEngineering generalcontractor Boiler modificationEquipment installation

Glass industry



The dry quenching technique utilizes a cold inert gas (combusted exhaust gas) to exchange heat with red hot red coke in a dry quenching furnace to cool the red coke. The inert gas that absorbs the heat of the red coke transfers the heat to the dry quenching boiler to generate steam, and the cooled inert gas is then circulated by the circulating fan into the dry extinguishing furnace to cool the red coke. The steam generated by the CDQ boiler is either incorporated into the steam pipe network of the plant or sent to generate electricity. In the reverse movement, the coke is gradually cooled to below 250 ° C, and then discharged by the unloading device at the bottom of the furnace; at the same time, the inert gas (or waste flue gas) is heated to about 800 ° C, passing through the dry quenching ramp After the primary dust collector, the boiler enters the dry quenching boiler; in the boiler, the water is heated by the hot air stream to generate steam, and the gas is cooled to about 200 ° C, and then re-supplied into the dry extinguishing furnace by the circulating fan through the secondary dust removal.
    

 

    
Glass kiln waste heat power generation process flow chart

The dry quenching technique utilizes a cold inert gas (combusted exhaust gas) to exchange heat with red hot red coke in a dry quenching furnace to cool the red coke. The inert gas that absorbs the heat of the red coke transfers the heat to the dry quenching boiler to generate steam, and the cooled inert gas is then circulated by the circulating fan into the dry extinguishing furnace to cool the red coke. The steam generated by the CDQ boiler is either incorporated into the steam pipe network of the plant or sent to generate electricity. In the reverse movement, the coke is gradually cooled to below 250 ° C, and then discharged by the unloading device at the bottom of the furnace; at the same time, the inert gas (or waste flue gas) is heated to about 800 ° C, passing through the dry quenching ramp After the primary dust collector, the boiler enters the dry quenching boiler; in the boiler, the water is heated by the hot air stream to generate steam, and the gas is cooled to about 200 ° C, and then re-supplied into the dry extinguishing furnace by the circulating fan through the secondary dust removal.
2018/08/16 14:44:43 16517

Related documents

Copy right ? 2018 Shanghai Industrial Boiler Co., Ltd.

Record number: Su ICP No. 18041342

主站蜘蛛池模板: 亚洲无人区码一二三码区别图片 | 日韩AV无码免费观看 | 久久亚洲av无码精品色麻豆夜 | 久久久久无码精品亚洲日韩 | 国产精品久久久久人妻无码网址 | 国产精品一二三入口播放 | 欧美中日韩 | 日本中文字幕乱码免费 | 午夜视频一区二区三区 | 男男女女爽爽爽视频免费 | 精品国产男人的天堂久久 | 国产又色又爽又黄刺激在线视频 | 国产999精品久久久久久 | 无码专区久久综合久综合字幕 | 久久婷婷一区二区三区国产 | 国产三级久久久精品麻豆三级 | 国产成人无码a区在线 | 国产免费无码成人A片在线观看 | 免费看午夜高清性色生活片 | 一本道天堂成在人线av无码免费 | 国产婷婷午夜精品无码A片 国产婷婷午夜无码A片 | av二区av三区 | 国产高清乱码又大又圆 | 国产成人免费视频观看 | 国产亚洲人成在线v网站 | 国产在线视视频有精品 | 久久婷婷六月综合色液啪 | 亚洲中文久久精品无码1 | 国产亚洲精品久久久久久入口 | 谁有色网址 | 精品综合久久88色鬼首页 | 在线观看国产亚洲视频免费 | 国产91高潮流白浆在线播放 | 国产成人一区免费观看 | 国产a毛片高清视频 | 国产福利95精品一区二区三区 | 亚洲欧洲校园自拍都市 | 欧美又大又粗又湿A片 | 久久精品亚洲欧美日韩久久国产亚洲一卡二卡 | 欧美日韩精品一区二区在线播放蜜臀 | 国产AV无码专区 |