Shanghai Industrial Boiler Co., Ltd./Shanghai industrial boiler (Wuxi) Co., Ltd.
Solution·Application area
Glass industry
The dry quenching technique utilizes a cold inert gas (combusted exhaust gas) to exchange heat with red hot red coke in a dry quenching furnace to cool the red coke. The inert gas that absorbs the heat of the red coke transfers the heat to the dry quenching boiler to generate steam, and the cooled inert gas is then circulated by the circulating fan into the dry extinguishing furnace to cool the red coke. The steam generated by the CDQ boiler is either incorporated into the steam pipe network of the plant or sent to generate electricity. In the reverse movement, the coke is gradually cooled to below 250 ° C, and then discharged by the unloading device at the bottom of the furnace; at the same time, the inert gas (or waste flue gas) is heated to about 800 ° C, passing through the dry quenching ramp After the primary dust collector, the boiler enters the dry quenching boiler; in the boiler, the water is heated by the hot air stream to generate steam, and the gas is cooled to about 200 ° C, and then re-supplied into the dry extinguishing furnace by the circulating fan through the secondary dust removal.
    

 

    
Glass kiln waste heat power generation process flow chart

The dry quenching technique utilizes a cold inert gas (combusted exhaust gas) to exchange heat with red hot red coke in a dry quenching furnace to cool the red coke. The inert gas that absorbs the heat of the red coke transfers the heat to the dry quenching boiler to generate steam, and the cooled inert gas is then circulated by the circulating fan into the dry extinguishing furnace to cool the red coke. The steam generated by the CDQ boiler is either incorporated into the steam pipe network of the plant or sent to generate electricity. In the reverse movement, the coke is gradually cooled to below 250 ° C, and then discharged by the unloading device at the bottom of the furnace; at the same time, the inert gas (or waste flue gas) is heated to about 800 ° C, passing through the dry quenching ramp After the primary dust collector, the boiler enters the dry quenching boiler; in the boiler, the water is heated by the hot air stream to generate steam, and the gas is cooled to about 200 ° C, and then re-supplied into the dry extinguishing furnace by the circulating fan through the secondary dust removal.

2018/08/16 14:44:43

16590

Prev Next
×
主站蜘蛛池模板: 蜜臀av人妻久久无码精品麻豆 | 人妻无码一区二区三区免费 | 久久精品18 | 熟妇女人妻1718P丰满少妇 | 精品人妻一区 | 日日夜夜天天779 | 免费阿v网站在线观看g | 久久婷婷精品国产一区二区 | 免费国产成人高清在线观看视频 | 亚洲影院在线播放 | 91在线无码一区二区 | 国产成人精品视频在放 | 精品 在线 视频 亚洲 | 久久久久久久亚洲AV无码 | 一本道在线高清观看 | 国产乱伦国产乱老熟300部视频 | 国产v欧美v日韩在线观看 | 一区二区三区国产精华液 | 国产精品亚洲专区无码影院 | 欧美激情A片无码大尺度 | 激情偷乱人成视频在线观看 | 特级做A爰片毛片A片免费 | 亚洲精华国产精华精华 | av天堂影片精品 | 欧美禽牲交在线观看 | 国产91精品看黄网站在线观看 | 欧美乱妇狂野欧美在线视频 | 久久丫免费无码一区二区 | 在线看片无码亚洲 | 国产三级农村妇女视频 | 无码人妻aⅴ一区二区三区色戒乐 | 人妻丰满精品一区二区A片 人妻丰满熟 | 激情婷婷网 | 午夜DJ国产精华日本无码 | 不卡无码人妻一区二区三区 | 欧美性猛交久久久久 | 亚洲色丰满少妇高潮18p | 亚洲一区二区在线观看不卡 | 国产精品麻豆久久99 | 免费啪视频在线观看视频日本 | 国产又粗又猛又爽的视频A片 |