Shanghai Industrial Boiler Co., Ltd./Shanghai industrial boiler (Wuxi) Co., Ltd.
Solution
Application area

Shanghai industrial boilers provide a one to one solution for different industry attributes and needs of customer enterprises.



Engineering generalcontractor

Shanghai industrial boiler is also committed to providing customers with energy conservation and environmental protection boiler project package solution.

Power station boiler EPC package
Shanxi Gaoyi Iron and Steel Co., Ltd. 15MW high temperature and extra high pressure gas power generation project
Unit operation mode:

A 190t/h high-temperature ultra-high pressure gas boiler (blast furnace gas mixed with converter gas) +1 15MW high-temperature ultra-high pressure back pressure steam turbine unit, steam turbine back pressure parameters: 3.9MPa (a), ~ 373 °C. The back pressure of the steam turbine is returned to the boiler reheater, and the steam temperature is raised to 450 ° C and sent to the steam blower of the steel mill.

Fuel fuel:Mixed gas of blast furnace gas and converter gas
Ignition method:Liquefied gas ignition

In principle, the boiler operates at base load, but has variable load peaking capability. The boiler has good adaptability to the sliding pressure operation and the constant pressure operation.

The time from ignition to full load of the boiler meets the following requirements under normal starting conditions:

Cold start (stop more than 72h)6~8 hours

Warm start (stop 10-72h)3~4 hours

Hot start (within 10 hours of shutdown)1.5~2 hours

Temperature adjustment method:The superheated steam is cooled by two-stage water spray; the reheated steam is cooled by a small amount of water spray.

The service life of the boiler is 30 years, and the life of the convective heating surface flushed by the smoke is more than 120,000 hours. The overhaul interval is 5 years.

The project has been put into operation according to the installation, and all the indicators have reached the predetermined requirements.



Boiler modification

Shanghai industrial boilers can be retrofitted by assembling a Seiko retrofitting team, which can be customized according to customer requirements according to local conditions.

With the continuous improvement of national energy policy and environmental protection requirements, Shanghai Industrial Boiler Co., Ltd. and Shanghai Industrial Boiler (Wuxi) Co., Ltd. have carried out in-depth research and development on the transformation of coal-fired boilers.

Shanghai Industrial Boiler Co., Ltd. and Shanghai Industrial Boiler (Wuxi) Co., Ltd. are willing to customize various boiler renovation solutions for the majority of users.
In order to improve the performance of the original boiler and reduce the emission concentration of the boiler, for the country's energy-saving and environmental protection cause to make due contributions.


Equipment installation

The quality of the engineering installation directly determines its effect after being put into use.

×
主站蜘蛛池模板: 国产中文字幕永久综合 | 丁香婷婷亚洲av成人综合app | 无码任你躁久久久久久久 | 日日夜夜天天779 | 欧美一卡2卡3卡4卡乱码 | av无码精品1区2区3 | 国产亚洲欧美日韩剧的剧情介绍 | 91天堂在线视频 | 精品无码国产在线一区二区 | 国产一区二区在线观看免费 | 国产剧情在线精品视频不卡 | 欧美成人另类 | 久久精品视频全国免费看 | 91精品免费久久久久久久久 | 国产又黄又大又色爽的A片小说 | 蜜臀黄色视频免费在线播放 | 2024国产精品久久久久 | 2024最新精品国自产拍视频 | 中文字幕一区二区三区在线观看 | 久久精品一本到99热免费 | 日本最新免费的一区二区 | 五月色综合无码一区二区三区 | 一级全黄毛片 | 免费人妻无码不卡中文字幕系列 | v无码东京热亚洲男人的天堂 | 欧美一区a| 亚洲一区二区三区高清 | 国产麻豆精品一区 | 噜噜噜亚洲热久久超碰av | 2024国产国拍亚洲精品 | 久视频在线| 久久精品无码一区二区国产 | 久久久久99精品国产片 | 日韩中文字幕在线播放 | 日韩在线午夜福利 | 午夜亚洲国产理论片4080 | 日韩在线卡2卡3卡4卡5卡免费 | 日日摸夜夜添夜夜添A片看见 | 任我鲁精品视频精品 | 日本亚洲精品久久蜜臀 | 国产成人久久精品一区二区 |